HVAC
Contents
Suite 104
Package Units
Unit | Size | Filters | Manufacturer | Model | Year | Serial | Thermostat | Service Areas | Notes |
---|---|---|---|---|---|---|---|---|---|
RTU #1 | 5 ton | (2) 16x25x2 | Bryant | ? | ? | ? | Creative Arts | Creative Arts, Bathrooms, Conf Rooms | |
RTU #2 | 5 ton | (2) 16x25x2 | Carrier | 48HJD006-541 | 2008 | 2408G20399 | Front Hallway | 3D Fab, Lobby, Electronics | |
RTU #3 | ? ton | (4) 20x20x2 | Lennox | ? | 2017 | ? | Interactive Classroom | Interactive Classroom | |
RTU #4 | 5 ton | (2) 20x30x2 | Trane | ? | ? | ? | Open Workroom | Open Workroom, Purple Classroom | Replaced in May 2015, need to get full info |
RTU #5 | 5 ton | (2) 16x25x2 | Bryant | ? | ? | ? | Workshop, north pillar | Workshop | |
RTU #6 | 5 ton | (2) 16x25x2 | Bryant | ? | ? | ? | Lecture Room | Workshop, Lecture Room | All vents to workshop are closed |
RTU #7 | 5 ton | (2) 16x25x2 | Carrier | 580FPV060074AB | 2007 | 3707G10259 | Workshop, south pillar | Workshop | |
RTU #8 | ? ton | (4) 20x20x2 | Lennox | ? | ? | ? | Workshop, south pillar | Workshop | |
RTU #9 | 10 ton | (4) 20x24x2 | Lennox | ZGB120S4BS1Y | 2020 | 5620D08932 | Woodworking | Break room, woodworking, metalworking |
Split Units
We currently have only one split unit, this unit services the server room only.
Unit | Type | Size | Filters | Manufacturer | Model | Year | Serial | Notes |
---|---|---|---|---|---|---|---|---|
SS 2 | Condenser | 5 ton | n/a | Goodman | CRT16 | 2006 | 060622933 | |
SS 2 | AHU | 5 ton | (1) 20x20x1 | Carrier | unknown | unknown | unknown | Located inside the building, above the interactive classroom. |
Suite 102
Package Units
Unit | Size | Filters | Manufacturer | Model | Year | Serial | Thermostat | Service Areas | Notes |
---|---|---|---|---|---|---|---|---|---|
RTU #1 | 7.5 ton | 4 - 16x20x2 | Carrier | 48TMD008-A-501 | 2003 | 0303G30643 | ? | Office | 208/230V 3 Phase Gas Pack |
RTU #2 | 10 ton | Trane | YSC120AELA | 2004 | 406100302L | ? | Office | 208/230V 3 Phase Gas Pack | |
RTU #3 | 10 ton | Trane | YSC120AELA | 2005 | ? | ? | Office | 208/230V 3 Phase Gas Pack | |
RTU #4 | 5 ton | 1 - 20x24x1 | Carrier | 48TJD006-511GA | 2005 | 3899G21027 | Office | 208/230V 3 Phase Gas Pack | |
RTU #5 | 7.5 ton | 4 - 20x24x2 | Allied | ZGB092S4BS1Y | Installed new 2018 |
5618G04125 | Workshop, north pillar | Workshop | 208/230V 3 Phase Gas Pack |
RTU #6 | 7.5 ton | 4 - 20x24x2 | Allied | ZGB092S4BS1Y | Installed new 2018 |
5618G06452 | Workshop, south pillar | Workshop | 208/230V 3 Phase Gas Pack |
RTU #7 | 15 ton | 6 - 24x24x2 | Allied | KCB180S4BN1G | Installed new 2018 |
5618E04674 | Workshop, south side of north pillar | Workshop | 480V 3 Phase A/C only |
- Serial numbers for RTU #5 and RTU #6 might be reversed.
- All RTUs are heat and A/C except RTU #7, which is A/C only
Split Units
New split unit installed 2018, this unit services the server room only. All table data below are just placeholders
Unit | Type | Size | Filters | Manufacturer | Model | Year | Serial | Notes |
---|---|---|---|---|---|---|---|---|
SS 2 | Condenser | 2 ton | n/a | Goodman | CRT16 | 2018 | 060622933 | |
SS 2 | AHU | 2 ton | (1) 20x20x1 | Carrier | unknown | 2018 | unknown | Located inside the building, above the interactive classroom. |
Manuals & Documents
Carrier 5T unit RTU#4: File:HVAC_Carrier_48TJD.pdf - manual
Allied 7.5T units RTU#5 and #6, Suite 102
File:Install ZSeries ZC 7.5 12.5.pdf - Installation manual from two new RTU's over Suite 102. Installed by the landlord October 2018
File:Zseries-75ton-installation-notes.jpg - Installation notes and start-up test from the install of the Suite 102 ZSeries 7.5 ton unit.
File:Zseries-75ton-installation-notes-2.jpg - Installation notes and start-up test from the install of the other Suite 102 ZSeries 7.5 ton unit.
Allied 15T unit RTU#7, Suite 102
File:HVAC_KSeries_KGA_15_25.pdf - Installation manual from new 15T RTU over Suite 102. Air Conditioning only. Installed by the landlord October 2018
File:HVAC_15_Ton.jpg - Installation notes and start-up test